Rudraprayag The kapatas of Lord Kedarnath have closed for the winter on the auspicious occasion of Bhaiya Dooj. Now for the coming six months, devotees will be able to pay obeisance to Lord Bholenath at the Panchgaddi site Omkareshwar temple in Ukhimath. There was heavy snowfall in Kedarnath on the occasion of closure of the valve.
As part of the scheduled program, special pujas took place in the temple from 3 am in the morning. The chief priest Shiva Shankar Linga performed all the pujas. At around 8.35 am, the main doors of the temple were closed in the presence of officials of the Police Administration, Devasthanam Board.
Kedar Baba’s Utsav Doli revolved around the temple, after which Kedar Baba’s Doli left for its first stop at Rampur. UP Chief Minister Yogi Adityanath and State Chief Minister Trivendra Singh Rawat were also present on the occasion. On the occasion of the closure of the doors of the temple, the entire Kedar Puri echoed with the shouts of Kedar Baba. The whole atmosphere became a devotee in the Dham on the melodious band of the army.
About one and a half to two thousand devotees were present on this occasion, the Lord’s Doli will rest in its first stop at Rampur today, after which the second reading will rest in Guptkashi Vishwanath Temple. The next day i.e. on 18 November, Lord Om will be enthroned at the Panka Gaddi site Omkareshwar Temple Ukhimath, where devotees will be able to see Bhole Baba for six months. There was heavy snowfall in Kedarnath on the occasion of closure of the valve. Since Sunday night, there was light drizzle and snowfall in Kedarnath, but there has been continuous snowfall since 4:00 in the morning, snow has accumulated above six inches.
Yogi Adityanath worshiped in integrated temple
Uttar Pradesh Chief Minister Yogi Adityanath offered obeisance at the Kedarnath temple, the same is going on in the worship of the temple from 3:00 am in the morning to the closure of the Kedarnath temple. Yogi Adityanath reached the Kedarnath temple at around 3:30 am today and worshiped at the temple till 6:00 am. He then moved to the guest house of his resting planet Garhwal Vikas Nigam. Worshiping the womb of the womb is being performed inside the temple by the chief priest Shiva Shankar since morning for closing the doors of the temple. At 8:30 in the morning, the doors of Kedarnath Bhagwan are to be closed for the winter season.
Leave a Reply